The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

FAIRway Danube /1

FAIRway Danube Project /1

Source of funding

CEF

Completion phase:

Completed project

Total eligible costs (EUR)

0,00

EU contribution (EUR)

0,00

Date of conclusion of the contract

12.11.2015

Project completion

09.02.2023

Project summary

The first phase of the coordinated implementation of the national action plan “Fairway Rehabilitation and Maintenance Master Plan of the Danube and its navigable tributaries”, which is a part of the part of the Rhine-Danube TEN-T Corridor Work Plan, is planned is this project.

The aforementioned document, which describes the coordinated efforts to eliminate bottlenecks along the Rhine-Danube Core Network Corridor, was created by the joint cooperation of all the Danube riparian countries. The project includes the following activities: regular updates of the national action plans, procurement of the equipment for hydrological services (water flow metering stations, surveying vessels), procurement of the waterway management systems, establishment of the harmonized water level forecast, implementation of the pilot activities. It also entails the evaluation and preparation of the documentation for the implementation of the future measures which shall contribute to the execution of the master plan.