The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Upgrade of the Rijeka Port infrastructure – On-shore Power Supply (POR2CORE - OPS)

Installation of On-shore Power Supply in the Port of Rijeka

Source of funding

CEF 2

Completion phase:

Project implementation

Total eligible costs (EUR)

15.464.520,00

EU contribution (EUR)

13.144.842,00

Date of conclusion of the contract

01.10.2024

Estimated completion date

31.05.2027

Project description

The project covers studies and works for installing the shore-side electricity supply within two container terminals in the maritime port, Port of Rijeka.

The project covers the following elements:

  1. Preparation of detailed designs and specifications, including obtaining all necessary permits for installation and safe operation of equipment needed for providing shore-side electricity supply at Adriatic Gate Container Terminal and Rijeka Gateway Container Terminal;
  2. Purchase and installation of equipment needed for providing shore-side electricity supply at Adriatic Gate Container Terminal and Rijeka Gateway Container Terminal;
  3. Commissioning of the shore-side electricity supply at Adriatic Gate Container Terminal and Rijeka Gateway Container Terminal.

Project goal

The project’s overall objective is to upgrade the Adriatic Gate Container Terminal and Rijeka Gateway Container Terminal in the Port of Rijeka to enable the use of shore-side electricity supply for berthed container ships. Both terminals ensure freight transhipment between three modes of transport – maritime, rail and road.

The project will bring online two shore-side electricity supply points with a capacity of 5 MVA each or alternatively one supply point with a capacity of 7,5 MVA for container ships berthed at the Adriatic Gate Container Terminal, as well as one shore-side electricity supply point with a capacity of 7,5 MVA for container ships berthed at the Rijeka Gateway Container Terminal.