{"id":4039,"date":"2021-07-19T08:05:00","date_gmt":"2021-07-19T08:05:00","guid":{"rendered":"https:\/\/povezanahrvatska.eu\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/"},"modified":"2021-07-20T12:38:12","modified_gmt":"2021-07-20T12:38:12","slug":"konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza","status":"publish","type":"news","link":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/","title":{"rendered":"Conference for project &#8211; &#8220;Rehabilitation and extension of the existing dock in the Unije port &#8211; II phase&#8221;"},"content":{"rendered":"\n<p>On Friday, the Aurora Hotel in Mali Lo\u0161inj hosted the initial conference for the project &#8220;Rehabilitation and extension of the existing dock in the Unije port &#8211; II phase&#8221;. The project was introduced to the interested public by the Director of CPA Mali Lo\u0161inj <strong>Filip Balija<\/strong>, deputy Prefect of the Primorje-Gorski Kotar County <strong>Vojko Braut<\/strong>, Director of the Sector for implementation, monitoring and coordination of island development policy <strong>Ivan Bota<\/strong>, representing the Ministry of Regional Development and EU Funds, and the representative of the contractor Pomgrad Engineering Ltd. <strong>Dobroslav \u0160estanovi\u0107<\/strong>.<\/p>\n\n\n\n<p>Rehabilitation and extension of the existing dock in the Unije port, worth just under \u20ac5 million, is a port infrastructure improvement project implemented by the Ministry of the Sea, Transport and Infrastructure with the objective of improved island connectivity. It involves the extension of the breakwater head and its widening by 30 m on either side in a &#8216;T&#8217; shape to allow, in the words of CPA Mali Lo\u0161inj Director &#8220;<em>the mooring of ferries, catamaran, and also yachts.<\/em>&#8221; The construction work should be completed by June 2022.<\/p>\n\n\n\n<p>The existing breakwater has a modest mooring capacity of 2 smaller vessels &#8211; inadequate to provide a secure link with Mali Lo\u0161inj, Cres, Rijeka, Pula and Zadar, which the development of Unije hinges on.<\/p>\n\n\n\n<p>The closing word of the conference fell to the deputy Prefect of Primorje-Gorski kotar County, Vojko Braut. &#8220;<em>It is a fact that our port authorities have managed to eke out close to \u20ac30 million in non-refundable grants, to fund five projects currently in implementation. Likewise, I would like to congratulate Director Filip Balija, and also the President of the Board of Directors without whose commitment all this would not be possible<\/em>&#8220;, the deputy said, referencing other port projects financed using the same model.<\/p>\n\n\n\n<p>In the Primorje-Gorski Kotar County the projects to upgrade the ports of Crikvenica, Cres, Ba\u0161ka and Mrtva\u0161ka are being implemented. Just like the rehabilitation and extension of the dock in the Unije port,  these projects are financed within the Operational Programme &#8220;Competitiveness and Cohesion 2014-2020&#8221;, with \u20ac29.65 of non-refundable grants. The sources of financing are the Cohesion Fund, with a share of 85%, and the State Budget, with a share of 15%.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The initial conference for the project &#8220;Rehabilitation and extension of the existing dock in the Unije port &#8211; II phase&#8221; Was held on Friday, 16 July.  The extension of the breakwater head and its widening in a &#8216;T&#8217; shape will permit the mooring of regular liner ships in the port of Unije.<\/p>\n","protected":false},"featured_media":4037,"template":"","acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Conference for project - &quot;Rehabilitation and extension of the existing dock in the Unije port - II phase&quot; - Povezanahrvatska<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Conference for project - &quot;Rehabilitation and extension of the existing dock in the Unije port - II phase&quot; - Povezanahrvatska\" \/>\n<meta property=\"og:description\" content=\"The initial conference for the project &quot;Rehabilitation and extension of the existing dock in the Unije port - II phase&quot; Was held on Friday, 16 July. The extension of the breakwater head and its widening in a &#039;T&#039; shape will permit the mooring of regular liner ships in the port of Unije.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/\" \/>\n<meta property=\"og:site_name\" content=\"Povezanahrvatska\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-20T12:38:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/povezanahrvatska.eu\/wp-content\/uploads\/2021\/07\/UN_04.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"506\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/\",\"url\":\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/\",\"name\":\"Conference for project - \\\"Rehabilitation and extension of the existing dock in the Unije port - II phase\\\" - Povezanahrvatska\",\"isPartOf\":{\"@id\":\"https:\/\/povezanahrvatska.eu\/#website\"},\"datePublished\":\"2021-07-19T08:05:00+00:00\",\"dateModified\":\"2021-07-20T12:38:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/povezanahrvatska.eu\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\/\/povezanahrvatska.eu\/en\/vijesti\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Conference for project &#8211; &#8220;Rehabilitation and extension of the existing dock in the Unije port &#8211; II phase&#8221;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/povezanahrvatska.eu\/#website\",\"url\":\"https:\/\/povezanahrvatska.eu\/\",\"name\":\"Povezanahrvatska\",\"description\":\"Povezanahrvatska\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/povezanahrvatska.eu\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Conference for project - \"Rehabilitation and extension of the existing dock in the Unije port - II phase\" - Povezanahrvatska","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/","og_locale":"en_US","og_type":"article","og_title":"Conference for project - \"Rehabilitation and extension of the existing dock in the Unije port - II phase\" - Povezanahrvatska","og_description":"The initial conference for the project \"Rehabilitation and extension of the existing dock in the Unije port - II phase\" Was held on Friday, 16 July. The extension of the breakwater head and its widening in a 'T' shape will permit the mooring of regular liner ships in the port of Unije.","og_url":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/","og_site_name":"Povezanahrvatska","article_modified_time":"2021-07-20T12:38:12+00:00","og_image":[{"width":900,"height":506,"url":"https:\/\/povezanahrvatska.eu\/wp-content\/uploads\/2021\/07\/UN_04.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/","url":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/","name":"Conference for project - \"Rehabilitation and extension of the existing dock in the Unije port - II phase\" - Povezanahrvatska","isPartOf":{"@id":"https:\/\/povezanahrvatska.eu\/#website"},"datePublished":"2021-07-19T08:05:00+00:00","dateModified":"2021-07-20T12:38:12+00:00","breadcrumb":{"@id":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/konferencija-projekta-sanacija-i-produzenje-postojeceg-pristana-luke-unije-ii-faza\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/povezanahrvatska.eu\/en\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/povezanahrvatska.eu\/en\/vijesti\/"},{"@type":"ListItem","position":3,"name":"Conference for project &#8211; &#8220;Rehabilitation and extension of the existing dock in the Unije port &#8211; II phase&#8221;"}]},{"@type":"WebSite","@id":"https:\/\/povezanahrvatska.eu\/#website","url":"https:\/\/povezanahrvatska.eu\/","name":"Povezanahrvatska","description":"Povezanahrvatska","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/povezanahrvatska.eu\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/news\/4039"}],"collection":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/media\/4037"}],"wp:attachment":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/media?parent=4039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}