{"id":7068,"date":"2025-01-16T14:23:22","date_gmt":"2025-01-16T14:23:22","guid":{"rendered":"https:\/\/povezanahrvatska.eu\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/"},"modified":"2025-01-16T14:31:37","modified_gmt":"2025-01-16T14:31:37","slug":"radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii","status":"publish","type":"projects","link":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/","title":{"rendered":"Works on the railway line on the section Hrvatski Leskovac-Karlovac &#8211; PHASE II"},"content":{"rendered":"\n<div class=\"c-blocks-section-header js-block-section-header\">\n    <div class=\"c-blocks-section-header__inner\">\n                    <h2 class=\"u-a3 c-blocks-section-header__title js-section-title\">\n                Project description            <\/h2>\n                    <h3 class=\"u-a2 c-blocks-section-header__description\">\n                The project refers to the reconstruction of the existing track and the construction of a second track on the 44.02 km section Hrvatski Leskovac-Karlovac on the M202 Zagreb Gk-Rijeka railway line.            <\/h3>\n            <\/div>\n<\/div>\n\n\n\n<p>In addition to the reconstruction and construction of the second track, the project includes the reconstruction of the stations, electric traction substation, individual level crossings, bridges, viaducts and other facilities, stops, conversion of a station into a stop, installation of an electronic signal safety device, level 1 ETCS and the traffic-management infrastructure subsystem with remote control of external elements, electrification with the 25 kV\/50 Hz system, construction of underpasses and overpasses, new arched roads for abolition of existing level crossings, construction of noise protection walls and a closed drainage system.<\/p>\n\n\n\n<div class=\"c-blocks-section-header js-block-section-header\">\n    <div class=\"c-blocks-section-header__inner\">\n                    <h2 class=\"u-a3 c-blocks-section-header__title js-section-title\">\n                Project goal            <\/h2>\n                    <h3 class=\"u-a2 c-blocks-section-header__description\">\n                Completion of the project will enable the introduction of high-quality urban and suburban passenger transport, increase mobility, increase the contribution of public passenger transport, which enables the introduction of quality integrated passenger transport.            <\/h3>\n            <\/div>\n<\/div>\n\n\n\n<p>The project plans to raise the speed on the section to a maximum of 160 km\/h, except in the area of \u200b\u200bMavra\u010di\u0107, Jastrebarski and Karlovac, where the speed will be 120 and 140 km\/h, respectively, due to space limitations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In addition to the reconstruction and construction of the second track, the project includes the reconstruction of the stations, electric traction substation, individual level crossings, bridges, viaducts and other facilities, stops, conversion of a station into a stop, installation of an electronic signal safety device, level 1 ETCS and the traffic-management infrastructure subsystem with remote [&hellip;]<\/p>\n","protected":false},"featured_media":1441,"template":"","project_type":[56],"phase":[62],"program":[68],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska\" \/>\n<meta property=\"og:description\" content=\"In addition to the reconstruction and construction of the second track, the project includes the reconstruction of the stations, electric traction substation, individual level crossings, bridges, viaducts and other facilities, stops, conversion of a station into a stop, installation of an electronic signal safety device, level 1 ETCS and the traffic-management infrastructure subsystem with remote [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/\" \/>\n<meta property=\"og:site_name\" content=\"Povezanahrvatska\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-16T14:31:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/povezanahrvatska.eu\/wp-content\/uploads\/2020\/05\/58-Rekonstrukcija-postojec\u0301eg-i-izgradnja-drugog-kolosijeka-na-dionici-Hrvatski-Leskovac-Karlovac.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1850\" \/>\n\t<meta property=\"og:image:height\" content=\"1100\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/\",\"url\":\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/\",\"name\":\"Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska\",\"isPartOf\":{\"@id\":\"https:\/\/povezanahrvatska.eu\/#website\"},\"datePublished\":\"2025-01-16T14:23:22+00:00\",\"dateModified\":\"2025-01-16T14:31:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/povezanahrvatska.eu\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projekti\",\"item\":\"https:\/\/povezanahrvatska.eu\/projekti\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Works on the railway line on the section Hrvatski Leskovac-Karlovac &#8211; PHASE II\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/povezanahrvatska.eu\/#website\",\"url\":\"https:\/\/povezanahrvatska.eu\/\",\"name\":\"Povezanahrvatska\",\"description\":\"Povezanahrvatska\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/povezanahrvatska.eu\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/","og_locale":"en_US","og_type":"article","og_title":"Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska","og_description":"In addition to the reconstruction and construction of the second track, the project includes the reconstruction of the stations, electric traction substation, individual level crossings, bridges, viaducts and other facilities, stops, conversion of a station into a stop, installation of an electronic signal safety device, level 1 ETCS and the traffic-management infrastructure subsystem with remote [&hellip;]","og_url":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/","og_site_name":"Povezanahrvatska","article_modified_time":"2025-01-16T14:31:37+00:00","og_image":[{"width":1850,"height":1100,"url":"https:\/\/povezanahrvatska.eu\/wp-content\/uploads\/2020\/05\/58-Rekonstrukcija-postojec\u0301eg-i-izgradnja-drugog-kolosijeka-na-dionici-Hrvatski-Leskovac-Karlovac.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/","url":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/","name":"Works on the railway line on the section Hrvatski Leskovac-Karlovac - PHASE II - Povezanahrvatska","isPartOf":{"@id":"https:\/\/povezanahrvatska.eu\/#website"},"datePublished":"2025-01-16T14:23:22+00:00","dateModified":"2025-01-16T14:31:37+00:00","breadcrumb":{"@id":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/povezanahrvatska.eu\/en\/projekti\/radovi-na-zeljeznickoj-pruzi-na-dionici-hrvatski-leskovac-karlovac-faza-ii\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/povezanahrvatska.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Projekti","item":"https:\/\/povezanahrvatska.eu\/projekti\/"},{"@type":"ListItem","position":3,"name":"Works on the railway line on the section Hrvatski Leskovac-Karlovac &#8211; PHASE II"}]},{"@type":"WebSite","@id":"https:\/\/povezanahrvatska.eu\/#website","url":"https:\/\/povezanahrvatska.eu\/","name":"Povezanahrvatska","description":"Povezanahrvatska","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/povezanahrvatska.eu\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/projects\/7068"}],"collection":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/media\/1441"}],"wp:attachment":[{"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/media?parent=7068"}],"wp:term":[{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/project_type?post=7068"},{"taxonomy":"phase","embeddable":true,"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/phase?post=7068"},{"taxonomy":"program","embeddable":true,"href":"https:\/\/povezanahrvatska.eu\/en\/wp-json\/wp\/v2\/program?post=7068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}