Project summary
The project included the extension and broadening of the existing landing wharf to a length of 56 m and width of 11 m; equipping the wharf; deepening the harbour to 4.8 m; development of the coastline with an approximately 65 m long vertical embankment wall; placement and equipping of a ferry ramp; construction of an operating plateau enclosed with a vertical concrete wall with a surface area of approximately 475 m² for passenger and vehicle embarkation/disembarkation and transshipment of goods to smaller tractors; and installation of a grease trap for drainage of the plateau and landing wharf.