The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Reconstruction of the Donje Čelo Port, island of Koločep

Reconstruction of the port open for public transport in Donje Čelo, island of Koločep

Source of funding

OPCC

Completion phase:

Completed project

Total eligible costs (EUR)

3.974.214,32

EU contribution (EUR)

3.378.082,18

Date of conclusion of the contract

26.05.2020

Project completion

07.02.2023

Videos and photos from the construction site

Aerial video — 20.06.2022. 12:00:00

Project summary

The project included the extension and broadening of the existing landing wharf to a length of 56 m and width of 11 m; equipping the wharf; deepening the harbour to 4.8 m; development of the coastline with an approximately 65 m long vertical embankment wall; placement and equipping of a ferry ramp; construction of an operating plateau enclosed with a vertical concrete wall with a surface area of approximately 475 m² for passenger and vehicle embarkation/disembarkation and transshipment of goods to smaller tractors; and installation of a grease trap for drainage of the plateau and landing wharf.