A A

The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Preparation of project documentation for the construction of the vertical quay in the Port of Vukovar

Designing the vertical quay in the Port of Vukovar

Source of funding

CEF

Completion phase:

Completed project

Total eligible costs (EUR)

1.677.851,00

EU contribution (EUR)

1.426.173,00

Date of conclusion of the contract

31.08.2020

Project completion

05.05.2026

Project description

The Action was part of the global project, which aims at developing Croatia’s core inland port Vukovar, located on the Rhine-Danube Corridor. The waterside infrastructure of the port, and its connections with the rail and road TEN-T core networks will be upgraded.

The main output of this Action is technical documentation, including location and building permits, the full EIA and final design for construction of the 300 m long vertical quay in the Vukovar port and its connection to existing railway infrastructure.

Project goal

Project implementation will prevent harmful high-water action in the port area and engage the currently unused shoreline in the performance of port functions, raising the capacity and competitiveness of the Port of Vukovar.