A A

The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Preparation of design documents for the reconstruction of the Okučani-Vinkovci railway section

Documentation for the reconstruction of the railway Okučani – Vinkovci

Source of funding

CEF

Completion phase:

Project implementation

Total eligible costs (EUR)

11.217.700,00

EU contribution (EUR)

9.535.045,00

Date of conclusion of the contract

27.10.2017

Estimated completion date

31.12.2024

Project summary

The project envisages the preparation of studies and technical documentation for upgrading the 131 km long railway section Okučani – Vinkovci which is a part of the railway line M104 Novska – Vinkovci – Tovarnik – state border with Serbia on the Pan-European Corridor X.

Preparation of project documentation is a precondition to begin works on the modernization and renewal of the section, of 12 stations and 13 stops, and it is part of an exhaustive reconstruction project on the Dugo Selo – state border with Serbia railway. Project activities include the preparation of conceptual designs, preparation of the Feasibility Study, economic and financial analyses (prior and final), preparation of the Environmental Impact Assessment, preparation of the Preliminary Design and obtaining the location permits, preparation of the Main Design and obtaining the building permits, and preparation of procurement documentation.