Project summary
The first phase of the coordinated implementation of the national action plan “Fairway Rehabilitation and Maintenance Master Plan of the Danube and its navigable tributaries,” which is part of the Rhine-Danube TEN-T Corridor Work Plan, was carried out in this project.
The aforementioned document, which describes the coordinated efforts to eliminate bottlenecks along the Rhine-Danube Core Network Corridor, was created through the joint cooperation of all Danube riparian countries. The project included the regular updating of national action plans, procurement of equipment for hydrological services (water flow metering stations, surveying vessels), procurement of waterway management systems, establishment of a harmonized water level forecast, and implementation of pilot activities. It also entailed the evaluation and preparation of documentation for the implementation of future measures contributing to the execution of the master plan.