The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Rehabilitation and extension of the existing dock in the Unije port - II phase, Island of Unije

Improved accessibility for island residents – Unije port (Mali Lošinj)

Source of funding

OPCC

Completion phase:

Completed project

Total eligible costs (EUR)

4.548.256,06

EU contribution (EUR)

3.865.528,43

Date of conclusion of the contract

26.10.2018

Project completion

19.09.2022

Project summary

The project envisages the extension of the breakwater head and its widening by 30 m on either side, in the shape of the letter T for the parallel mooring of two ships or ferries.

The planned operation will provide berth for ferries up to 48 m long on the north side of the dock, and ships up to 70 m long (or two catamaran or smaller vessels up to 41,5 m long) on the western side of the dock. Additionally, planned activities include the placement of a ticket office and reconstruction of the baggage handling plateau. The increase in total coastline length and port surface area will ensure adequate coastal liner mooring capacity for the ferry line Mali Lošinj – Unije – Srakane Vele – Susak and high-speed ferry lines Pula – Unije – Susak – Mali Lošinj – Ilovik – Silba – Zadar and Mali Lošinj – Ilovik – Susak – Unije – Martinščica – Cres – Rijeka, and improve port safety.