The Ministry of the Sea, Transport and Infrastructure (MMPI) actively participated in the use of available EU funds through the financial period 2014-2020. The improvement of the website was co-financed by technical assistance funds from the Operational Program Competitiveness and Cohesion, from the European Regional Development Fund. The content of this site is the responsibility of the Ministry of the Sea, Transport and Infrastructure.

Preparation of study and project documentation for the modernization of the Zagreb GK – Rijeka railway line (M202) on the section Karlovac – Oštarije

Modernisation of the Karlovac – Oštarije railway section – PHASE II

Source of funding

PCC

Completion phase:

Project implementation

Total eligible costs (EUR)

8.599.181,13

EU contribution (EUR)

7.309.303,96

Date of conclusion of the contract

01.01.2024

Estimated completion date

31.12.2027

Project description

The project includes the drafting of study and project documentation for the modernization and construction of the railway route Zagreb – Rijeka connecting the wider area of ​​Karlovac and Oštarije, while meeting the technical and technological conditions that must be met by the main corridor railway lines for international traffic.

Specifically, the following study and project documentation will be drafted:

  1. Feasibility study
  2. Cost-benefit analysis
  3. Environmental impact assessment
  4. Concepts with associated studies and documentation required for obtaining a location permit
  5. Main designs with associated studies and documentation for obtaining building permits
  6. Documentation required for resolving property-legal relations and securing proof of legal interest
  7. Tender documentation for works and supervision.

Project goal

After the documentation is created, it will serve as a tool for making further decisions or strategies and for the creation of implementation projects based on which the modernization works of the railway section Karlovac – Oštarije will be carried out.

The current state of the Karlovac-Oštarije railway section does not meet the technical and technological conditions required by the main corridor railways for international traffic, it does not meet the technical specifications for the interoperability of the railway system, and its throughput capacity does not meet the planned traffic on the relevant section.