Project summary
The project envisages the extension and broadening of the existing landing wharf to the length of 56 m and width of 11 m; equipping the wharf; deepening the harbour to 4,8 m; development of the coastline with an approx. 65 m long vertical embankment wall; placing and equipping a ferry ramp; construction of an operating plateau enclosed with a vertical concrete wall with a surface area of approx. 475 m2 for passenger and vehicle embarkation / disembarkation and transhipment of goods to smaller tractors; and installation of a grease trap for drainage of the plateau and landing wharf.